CFA072417

CrossFit Altius – CrossFit

Warm-up

3 mins of jump rope work. Work singles or doubles

2 rds:

Burgener Warm Up (down and finish), (elbows high and outside), (muscle snatch), (snatch land 2″), (snatch land 4″), (snatch land 6″)

Hang Snatch (5×1)

-Use work up method:

Find your heaviest “”””perfect”””” single. Make sure that you have 5 work sets total within 10% of this lift (max for the day is included as a work set). You may have hit these in the build up, or you may need to back off after finding your heaviest and complete another set or two at 90% or higher of your best for the day.”””

Metcon (Time)

For time:

10 Dumbbell Thrusters, 50/35 lbs

50 Double Unders

8 Dumbbell Thrusters, 50/35 lbs

40 Double Unders

6 Dumbbell Thrusters, 50/35 lbs

30 Double Unders

4 Dumbbell Thrusters, 50/35 lbs

20 Double Unders

2 Dumbbell Thrusters, 50/35 lbs

10 Double Unders
Goal: 10 min or less

*scale for DU is double singles

Cool Down

Easy Row/Ride/Walk 3-5 min

OH Weighted Abmat Sit Up

3 x 15

Previous Post:

«

Next Post:

»